01
National Pavillion of Serbia - EXPO 2027
Project: A landmark pavilion designed to present Serbia's identity, creativity and vision within the international setting of EXPO 2027 Belgrade.
Scope of Work: Preliminary Design, Permit Design, Detailed Design, BIM, Interior Design, Issued for Construction, Project Management.
Size: Approx. 17.000m².
Client: Power Construction Corporation of China
Location: Belgrade, Serbia
Year: 2025/2026

02
Exhibition Complex - EXPO 2027
Project: As part of the Phase A development for EXPO 2027 Belgrade, our company executed 1000 tons of secondary steelwork. The project required precise technical coordination and efficient organization.
Scope of Work: Production and installation of secondary steel construction in objects 14 - 18.
Quantity: Approx. 1000 tons of steel.
Client: MILLENNIUM TEAM d.o.o.
Location: Belgrade, Serbia
Year: 2025/2026

03
Belgrade Waterfront - Plot 33
Project: Belgrade Fair Sales Center and Restaurant
Scope of Work: Production and installation of complete steel structure for the sales center facility, including primary and secondary steel elements, roof structure, canopies, staircases and other steel components.
Quantity: Total steel quantity approx. 150 tons, H ≈ 10 m.
Client: MODULOR d.o.o.
Location: Belgrade, Serbia
Year: 2025/2026

04
Hamburger Recycling
Project: Waste Material Storage Facility
Scope of Work: Production and installation of the main steel structure for a large canopy facility, including all supporting structural elements and connections.
Quantity: Total steel quantity approx. 50 tons.
Client: Hamburger Recycling d.o.o.
Location: Zemun Polje, Belgrade, Serbia
Year: 2025/2026

05
Belgrade Waterfront - Plot 6
Project: Foundation Pit for Mixed-Use Building
Scope of Work: Fabrication and installation of the steel shoring system for the foundation pit, required for the construction of a mixed-use residential and commercial building with two basement levels, ground floor, five upper floors and a recessed top floor.
Quantity: 36 tons of steel
Client: ZIDAR d.o.o.
Location: Belgrade, Serbia
Year: 2025

06
Belgrade Waterfront - Plot 11
Project: Kindergarten and School Facility
Scope of Work: Fabrication and installation of custom steel structures for the kindergarten facility within the Belgrade Waterfront development. The scope included pergolas, entrance and outdoor canopies, the exhibition gallery structure, and the custom steel structure for the kindergarten slide.
Quantity: 50 tons of steel
Client: ZIDAR d.o.o.
Location: Belgrade, Serbia
Year: 2025

07
Belgrade Waterfront - Plot 16
Project: Steel Canopies for Mixed-Use Building
Scope of Work: Fabrication and installation of complete steel canopy structures for the residential and commercial buildings within Plot 16 of the Belgrade Waterfront development. The scope included the production, delivery and installation of 11 canopy structures, with all related steel elements and connection components.
Quantity: 40 tons of steel
Client: NEW QUEST d.o.o.
Location: Belgrade, Serbia
Year: 2025

08
Millitary Printing House
Project: Military Barracks Žarkovo – Production Hall
Scope of Work: Fabrication and installation of the steel structure for a production hall within the Žarkovo military barracks complex. The works included the complete structural steel frame and related steel elements required for the execution of the facility.
Quantity: approx. 2000 m² / 70 tons of steel
Client: MODULOR d.o.o.
Location: Belgrade, Serbia
Year: 2024

09
Warehouse Hall Facility
Project: BB Link Warehouse Hall in Surčin
Scope of Work: Design and construction of the complete warehouse hall facility with a total area of approximately 700 m² and a ridge height of H=8 m. The scope included dismantling of the existing structure, foundation works, reinforcement and concrete works, execution of the ferro-concrete floor slab, fabrication and installation of the steel structure, as well as roofing and cladding of the hall with thermal insulation panels.
Size: approx. 700 m² / ridge height H=8 m
Client: BB LINK d.o.o.
Location: Belgrade, Serbia
Year: 2024

10
Wholesale Market Obrenovac
Project: Canopy Structure at Obrenovac Wholesale Market
Scope of Work: Fabrication and installation of the steel canopy structure and other secondary steel elements. The works also included roofing and flashing works, covering approximately 1,500 m² with 15 cm thick thermal insulation panels, including all required accompanying flashings and finishing elements.
Quantity: approx. 1,500 m²
Client: JADRAN d.o.o.
Location: Belgrade, Serbia
Year: 2023

11
BIG CEE Kragujevac
Project: BIG CEE Kragujevac Retail Center
Scope of Work: Fabrication and installation of various steel structures for the BIG CEE Kragujevac retail center. The scope included steel pergolas, canopies, bay window structures, parapet and attic steel elements, as well as the fabrication and installation of a 25 m high advertising totem.
Quantity: approx. 140 t of steel
Client: GIA d.o.o.
Location: Kragujevac, Serbia
Year: 2023

12
MK Kliniken Pancevo
Project: Modular Container Production Complex
Scope of Work: Fabrication and installation of steel structures, the scope included facade substructure, canopy structures, roof structure, bracing systems, other related steel elements and cladding of the facility.
Quantity: approx. 340 t of steel / approx. 40,000 m² of thermal insulation panel
Client: STRABAG d.o.o.
Location: Pančevo, Serbia
Year: 2023

13
Ravno Selo Cultural Center
Project: Steel works on reconstruction of the Ravno Selo Cultural Center
Scope of Work: Fabrication and installation of internal technical galleries and steel bridges within the cultural center building.
Quantity: approx. 25 t of steel
Client: MODULOR d.o.o.
Location: Vrbas, Serbia
Year: 2023

14
Aviation Academy
Project: Aviation Academy – “Petar Drapšin” Secondary School
Scope of Work: Fabrication and installation of steel structures for the reconstruction and extension of the Aviation Academy – “Petar Drapšin” Secondary School facility.
Quantity: approx. 145 t of steel
Location: Dorćol, Belgrade, Serbia
Client: JADRAN d.o.o.
Year: 2022

15
BioSense Institute
Project: Institute for Artificial Intelligence Research and University Center
Scope of Work: Execution, fabrication and installation of a complex cantilevered steel amphitheatre structure spanning three levels. The structure was made of custom-fabricated steel girders and included a 21 m cantilever overhang, requiring high-precision fabrication and installation of the main load-bearing steel elements.
Client: MODULOR d.o.o.
Quantity: approx. 155 t of steel
Location: Novi Sad, Serbia
Year: 2022

16
BIG Novi Sad
Project: BIG “Old Mill Center” Shopping Center
Scope of Work: Fabrication and installation of steel structures for the BIG “Old Mill Center” shopping center. The scope included the entrance portal, internal portal, intermediate floor structure, elevator shaft structure, advertising panels and other related steel elements, together with accompanying civil works and finishing trade works.
Client: BIG CEE SERBIA d.o.o.
Quantity: approx. 120 t of steel
Location: Novi Sad, Serbia
Year: 2022

17
Master Team
Project: Production, Warehouse and Administration Complex
Scope of Work: Fabrication and installation of the steel structure for a production, warehouse and administration complex. The scope also included accompanying roofing and cladding works, sheet metal works and waterproofing works required for the complete execution of the facility envelope.
Client: MASTER SOLAR d.o.o.
Quantity: approx. 95 t of steel
Location: Belgrade, Serbia
Year: 2022

18
Belgrade Drama Theatre
Project: Belgrade Drama Theatre – Summer Stage
Scope of Work: Main design, fabrication and installation of a modular demountable outdoor stage steel structure for the summer stage of the Belgrade Drama Theatre. The structure was designed and executed as a temporary assembly system suitable for outdoor use, repeated installation and dismantling.
Client: MILLENNIUM TEAM d.o.o.
Quantity: approx. 12 t of steel
Location: Belgrade, Serbia
Year: 2021

19
Glass Onion House
Project: Glass Onion House Film Set Structure
Scope of Work: Structural design of the load-bearing steel platform, together with the steel substructure required to support the spherical glass cladding system. The structure was designed and executed for the production needs of the feature film Glass Onion: A Knives Out Mystery, with interior set works carried out in Belgrade studios.
Client: WIP TKO PRODUCTIONS d.o.o.
Quantity: 55m²
Location: Belgrade, Serbia
Year: 2021

20
MFD Košutnjak
Project: MFD Košutnjak – Multifunctional Sports Hall
Scope of Work: Fabrication and installation of various steel structures for the multifunctional sports hall within the MFD Košutnjak sports complex. The scope included façade substructure, steel works for the shooting range, rooftop ventilation units, partition wall structures, platforms, opening reinforcements, shafts, access hatches and other related secondary steel elements.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 85 t of steel
Location: Belgrade, Serbia
Year: 2021

21
West 65
Project: West 65 Shopping Center and Tower
Scope of Work: Fabrication and installation of various steel structures for the West 65 Shopping Center and Tower complex in New Belgrade. The scope included shopping center roof lanterns, facade substructures, crane connection structures to the tower building, media wall steel structure, intermediate floor structures, entrance canopies, supports for mechanical installations, as well as underground metalwork including fences, access ladders, platforms, manholes, ramps, partitions and other related steel elements.
Client: PFB d.o.o.
Quantity: approx. 330 t of steel
Location: New Belgrade, Serbia
Year: 2020/2021

22
JAT TEHNIKA
Project: Nikola Tesla Airport – JAT Tehnika Hangar 2, Large Hangar
Scope of Work: Fabrication and installation of steel structures for the reconstruction of the roof lantern system on the existing Hangar 2 building at Nikola Tesla Airport. The works included replacement of light domes, execution of new steel support and secondary structures, and all accompanying roofing, sheet metal and waterproofing works necessary for the completion of the roof reconstruction.
Client: JAT Tehnika
Quantity: approx. 90 t of steel
Location: Belgrade, Serbia
Year: 2017/2020

23
Diplomatic Facilities
Project: Diplomatic and Administrative Facilities
Scope of Work: Execution of steel and locksmith works on various diplomatic and administrative facilities in Belgrade, including embassies, diplomatic missions, ambassadors’ residences, diplomatic schools, administrative buildings and management facilities. The scope also included accompanying construction works, roofing works, sheet metal works and craft finishing works required for the maintenance, reconstruction and adaptation of the facilities.
Client: DIPOS a.d.
Location: Belgrade, Serbia
Year: 2012/2021

24
Hotel Indigo
Project: Indigo Hotel, Belgrade City Center
Scope of Work: Fabrication and installation of steel structures for the Indigo Hotel building in central Belgrade. The scope included reinforcement of the existing building structure, execution of all newly designed steel structural elements, and small accompanying metalwork required for the reconstruction and adaptation of the facility.
Client: MILLENNIUM TEAM d.o.o.
Quantity: approx. 120 t of steel
Location: Belgrade, Serbia
Year: 2019/2020

25
Tamnava Mine Coal Dump
Project: Kolubara Tamnava Mine – New Coal Dump
Scope of Work: Fabrication and installation of steel structures for the new coal dump facility at the Kolubara Tamnava mine. The scope included belt conveyor bridges, service platforms, access ladders, staircases, safety fences and other related steel elements required for operation and maintenance access.
Client: ENERGOPROJEKT OPREMA a.d.
Quantity: approx. 90 t of steel
Location: Lazarevac, Serbia
Year: 2019

26
Bosch Complex Expansion
Project: Robert Bosch Production Complex Expansion Simanovci
Scope of Work: Fabrication and installation of steel structures for the expansion of the Robert Bosch production complex in Simanovci. The scope included steel structures for facilities PCI 102, PCI 105 and PCI 108, tubular bridge structures with spans of L=40 m and L=21 m, as well as accompanying metalwork including fences, access ladders, staircases, platforms, manholes, ramps, partitions and other related steel elements.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 350 t of steel
Location: Simanovci, Serbia
Year: 2018/2019

27
Kalenic Market Design
Project: Kalenic Market – Office 59 Reconstruction Design
Scope of Work: Reconstruction design for Office 59 within Kalenic Market in Vracar, Belgrade. The scope included preparation of design documentation for the adaptation and improvement of the existing market office space, with the aim of supporting its functional reorganization and integration within the existing market facility.
Client: JKP Belgrade Market
Quantity: approx. 317 t
Location: Vracar, Belgrade, Serbia
Year: 2019

28
Bridge over Lepenica
Project: Bridge over the Lepenica River in Batocina
Scope of Work: Fabrication and installation of the steel structure for a bridge over the Lepenica River in Batocina. The project included an arched steel bridge structure with a span of L=45 m, together with related structural steel elements required for the execution of the bridge. The bridge design features an exposed arch structure, simple semi-transparent railing and integrated lighting.
Client: BAUWESEN d.o.o.
Quantity: approx. 40 t of steel
Location: Batocina, Serbia
Year: 2019

29
Recycling Center Pozarevac
Project: Pozarevac Recycling and Waste Selection Center
Scope of Work: Fabrication and installation of the steel structure for the Recycling and Waste Selection Center in Pozarevac. The facility forms part of the municipal waste management infrastructure near the Jeremijino Polje landfill and is intended for sorting, baling and further transport of municipal waste. The scope included structural steel works for the recycling center buildings and related steel elements required for the operation of the waste selection complex.
Client: BAUWESEN d.o.o.
Quantity: approx. 80 t of steel
Location: Pozarevac, Serbia
Year: 2019

30
Railway Infrastructure Works
Project: Belgrade Railway Infrastructure Works - Resnik, Kijevo, Rakovica, Knezevac
Scope of Work: Fabrication and installation of steel structures and metalwork for railway infrastructure facilities in Belgrade. The scope included steel works at Resnik railway station, including an emergency intervention facility and wagon repair hall, as well as platform railings, staircases and ramps at Resnik, Kijevo, Knezevac and Rakovica railway stations. The works also included steel bearing chairs at Belgrade Center railway station, Prokop, used for receiving and supporting concrete structural elements.
Client: BAUWESEN d.o.o.
Quantity: approx. 250 t of steel / approx. 300 m of steel and stainless steel railings
Location: Belgrade, Serbia
Year: 2018

31
autobuska stanica nbbggd.jpg
Project: New Belgrade Bus Station – Annex Building
Scope of Work: Fabrication and installation of the steel structure for the annex building of the new bus station complex in Block 42, New Belgrade. The scope included the main structural steel elements and related secondary steel components required for the execution of the annex facility.
Client: BAUWESEN d.o.o.
Quantity: approx. 50 t of steel
Location: New Belgrade, Serbia
Year: 2018

32
CRH Cement Plant
Project: CRH Cement Plant – New Furnace Building
Scope of Work: Main structural design of the steel structure for the new furnace building within the CRH cement plant in Popovac. The scope included design documentation for the main load-bearing steel structure and related steel elements required for the execution of the industrial facility.
Client: CRH d.o.o. / Holcim Srbija / GOSA MONTAZA a.d.
Quantity: approx. 104 t of steel
Location: Popovac, Paracin, Serbia
Year: 2018

33
Daily Express
Project: Daily Express Distribution Center – Reconstruction and Extension
Scope of Work: Fabrication and installation of the steel structure for the reconstruction and extension of the Daily Express distribution center on Pancevacki Put in Belgrade, within the former “Janko Lisjak” factory complex. The project covered an extended facility area of approximately 10,000 m² and included a large-span steel structure with a maximum span of L=54 m. The scope also included accompanying construction works, roofing and cladding works, as well as sheet metal works required for the complete execution of the facility envelope.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 220 t of steel / approx. 10,000 m² facility extension
Location: Belgrade, Serbia
Year: 2017

34
Nikola Tesla Airport
Project: Nikola Tesla Airport – Terminal 1 and Terminal 2 Reconstruction
Scope of Work: Fabrication and installation of steel structures for the reconstruction and adaptation of Terminal 1 and Terminal 2 at Nikola Tesla Airport in Belgrade. The scope included structural steel works and related secondary steel elements required for the execution of the terminal adaptation works within the existing airport facilities.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 70 t of steel
Location: Belgrade, Serbia
Year: 2016/2017

35
Bezanijska Kosa Market
Project: Bezanijska Kosa Market
Scope of Work: Fabrication and installation of steel structures for the Bezanijska Kosa Market facility in Belgrade. The scope included the main and secondary steel structures, together with accompanying construction works, roofing and cladding works, as well as sheet metal works required for the complete execution of the market facility.
Client: VEGRAP d.o.o.
Quantity: approx. 100 t of steel
Location: Bezanijska Kosa, Belgrade, Serbia
Year: 2017

36
Napred Business Building
Project: Napred Business Building – Extension and Reconstruction
Scope of Work: Fabrication and installation of steel structures for the extension and reconstruction of the Napred Business Building in New Belgrade. The scope included reinforcement of the existing concrete structure, execution of the new load-bearing steel structure for the building extension, intermediate floor structures and other related steel elements required for the reconstruction works.
Client: NAPRED a.d.
Quantity: approx. 150 t of steel
Location: New Belgrade, Serbia
Year: 2016

37
Obilicev Venac Public Garage
Project: Obilicev Venac Public Garage – Reconstruction and Extension
Scope of Work: Fabrication and installation of special steel elements for the reconstruction and extension of the Obilicev Venac public garage in central Belgrade. The scope included custom steel positions and related structural elements required for the adaptation and upgrade of the existing garage facility.
Client: MILLENNIUM TEAM d.o.o.
Quantity: approx. 45 t of steel
Location: Belgrade, Serbia
Year: 2016

38
Bolec Shopping Center
Projects: Bolec Shopping Center; JP Ada Ciganlija Administrative Building; Unicredit Bank Administrative Building; W.D. Concord West Administrative Building; Magna Pharmacia Fitness Club; Beorol Production Plant; Hit Auto Sales Salon; Energotehna Juzna Backa Canopies; Lilly Drogerie Business Buildings; Take Square Rodizzio GTC Restaurant.
Scope of Work: Fabrication and installation of steel structures for multiple extensions, reconstructions and adaptations of commercial, administrative, industrial, retail and hospitality facilities.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 950 t of steel
Location: Belgrade, Serbia
Year: 2015/2016

39
Häfele Showroom
Project: Häfele Showroom, New Belgrade Block 41
Scope of Work: Concept design, interior design, design for execution and execution of fit-out works for the Häfele showroom in New Belgrade. The scope included preparation of design documentation and complete interior fit-out works required for the showroom space.
Client: HAFELE SERBIA d.o.o.
Quantity: Project Documentation
Location: New Belgrade, Serbia
Year: 2015

40
DIS Market
Project: DIS Novi Sad; DIS Lazarevac; DIS Kaludjerica; DIS Krnjevo; DIS Novi Banovci; DIS Indjija; DIS Mladenovac; DIS Velika Plana; MAXI-145; MAXI-782; MAXI-143; MAXI-761; MAXI-496; MAXI-129; MAXI-502; MAXI-124; MAXI-185; MAXI-195; TEMPO Kvantas; MAXI-104; MAXI-141; MAXI-182; MAXI-485; MAXI-764; TEMPO Ada Ciganlija; Delhaize Distribution Center
Scope of Work: Fabrication and installation of steel structures, locksmith works, sheet metal works and finishing trade works.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 1,670 t of steel
Location: Serbia
Year: 2015/2016

41
Lukoil Gas Stations Totem
Project: Lukoil Gas Stations; Air Serbia Administration Building, Belville;
Scope of Work: Fabrication and installation of steel structures for advertising boards, billboards and advertising totems. The scope included 4 advertising billboards for the Air Serbia Administration Building in Belville and 33 advertising totems for Lukoil gas stations.
Client: ELITAS d.o.o.
Quantity: approx. 220 t of steel / 4 billboards / 33 advertising totems
Location: Serbia
Year: 2014/2015

42
Rectorate of the University of Belgrade
Project: Rectorate of the University of Belgrade – Kapetan Misino Zdanje
Scope of Work: Fabrication and installation of steel structures for the extension, reconstruction and adaptation of the Rectorate of the University of Belgrade, Kapetan Misino Zdanje. The scope also included accompanying construction works, sheet metal works and finishing trade works required for the adaptation of the existing historic building.
Client: ORNAMENT d.o.o.
Quantity: approx. 50 t of steel
Location: Belgrade, Serbia
Year: 2013/2014

43
Sojaprotein Industrial Complex
Project: Sojaprotein Industrial Complex – Silos
Scope of Work: Fabrication and installation of steel structures for the extension, rehabilitation and reconstruction of the Sojaprotein industrial silo complex in Becej. The scope included steel works on the reception bunker, elevator columns, unloading terminals, openings on silo cells and other related structural steel elements.
Client: SOJAPROTEIN a.d. / VICTORIA GROUP a.d.
Quantity: approx. 120 t of steel
Location: Becej, Serbia
Year: 2013

44
Alubond Europe Production Factory
Project: Alubond Europe Production Factory; Ferro Corp Production Hall for Ship Elements; Messer Tehnogas Helium Distribution Center;
Scope of Work: Fabrication and installation of steel structures for production and industrial facilities. The works included extension and reconstruction of the Ferro Corp production hall for ship elements in Borca, steel structure works for the Messer Tehnogas helium distribution center in the Pancevo industrial zone, and steel structure works for the Alubond Europe production factory in Banatski Karlovac.
Client: FERRO CORP d.o.o. / MESSER TEHNOGAS a.d. / ALUBOND EUROPE d.o.o.
Quantity: approx. 350 t of steel
Location: Banatski Karlovac, Serbia / Borca, Belgrade, Serbia / Pancevo, Serbia
Year: 2012/2013
01 / 44
National Pavillion of Serbia - EXPO 2027
Project: A landmark pavilion designed to present Serbia's identity, creativity and vision within the international setting of EXPO 2027 Belgrade.
Scope of Work: Preliminary Design, Permit Design, Detailed Design, BIM, Interior Design, Issued for Construction, Project Management.
Size: Approx. 17.000m².
Client: Power Construction Corporation of China
Location: Belgrade, Serbia
Year: 2025/2026

01
National Pavillion of Serbia - EXPO 2027
Project: A landmark pavilion designed to present Serbia's identity, creativity and vision within the international setting of EXPO 2027 Belgrade.
Scope of Work: Preliminary Design, Permit Design, Detailed Design, BIM, Interior Design, Issued for Construction, Project Management.
Size: Approx. 17.000m².
Client: Power Construction Corporation of China
Location: Belgrade, Serbia
Year: 2025/2026

02
Exhibition Complex - EXPO 2027
Project: As part of the Phase A development for EXPO 2027 Belgrade, our company executed 1000 tons of secondary steelwork. The project required precise technical coordination and efficient organization.
Scope of Work: Production and installation of secondary steel construction in objects 14 - 18.
Quantity: Approx. 1000 tons of steel.
Client: MILLENNIUM TEAM d.o.o.
Location: Belgrade, Serbia
Year: 2025/2026

03
Belgrade Waterfront - Plot 33
Project: Belgrade Fair Sales Center and Restaurant
Scope of Work: Production and installation of complete steel structure for the sales center facility, including primary and secondary steel elements, roof structure, canopies, staircases and other steel components.
Quantity: Total steel quantity approx. 150 tons, H ≈ 10 m.
Client: MODULOR d.o.o.
Location: Belgrade, Serbia
Year: 2025/2026

04
Hamburger Recycling
Project: Waste Material Storage Facility
Scope of Work: Production and installation of the main steel structure for a large canopy facility, including all supporting structural elements and connections.
Quantity: Total steel quantity approx. 50 tons.
Client: Hamburger Recycling d.o.o.
Location: Zemun Polje, Belgrade, Serbia
Year: 2025/2026

05
Belgrade Waterfront - Plot 6
Project: Foundation Pit for Mixed-Use Building
Scope of Work: Fabrication and installation of the steel shoring system for the foundation pit, required for the construction of a mixed-use residential and commercial building with two basement levels, ground floor, five upper floors and a recessed top floor.
Quantity: 36 tons of steel
Client: ZIDAR d.o.o.
Location: Belgrade, Serbia
Year: 2025

06
Belgrade Waterfront - Plot 11
Project: Kindergarten and School Facility
Scope of Work: Fabrication and installation of custom steel structures for the kindergarten facility within the Belgrade Waterfront development. The scope included pergolas, entrance and outdoor canopies, the exhibition gallery structure, and the custom steel structure for the kindergarten slide.
Quantity: 50 tons of steel
Client: ZIDAR d.o.o.
Location: Belgrade, Serbia
Year: 2025

07
Belgrade Waterfront - Plot 16
Project: Steel Canopies for Mixed-Use Building
Scope of Work: Fabrication and installation of complete steel canopy structures for the residential and commercial buildings within Plot 16 of the Belgrade Waterfront development. The scope included the production, delivery and installation of 11 canopy structures, with all related steel elements and connection components.
Quantity: 40 tons of steel
Client: NEW QUEST d.o.o.
Location: Belgrade, Serbia
Year: 2025

08
Millitary Printing House
Project: Military Barracks Žarkovo – Production Hall
Scope of Work: Fabrication and installation of the steel structure for a production hall within the Žarkovo military barracks complex. The works included the complete structural steel frame and related steel elements required for the execution of the facility.
Quantity: approx. 2000 m² / 70 tons of steel
Client: MODULOR d.o.o.
Location: Belgrade, Serbia
Year: 2024

09
Warehouse Hall Facility
Project: BB Link Warehouse Hall in Surčin
Scope of Work: Design and construction of the complete warehouse hall facility with a total area of approximately 700 m² and a ridge height of H=8 m. The scope included dismantling of the existing structure, foundation works, reinforcement and concrete works, execution of the ferro-concrete floor slab, fabrication and installation of the steel structure, as well as roofing and cladding of the hall with thermal insulation panels.
Size: approx. 700 m² / ridge height H=8 m
Client: BB LINK d.o.o.
Location: Belgrade, Serbia
Year: 2024

10
Wholesale Market Obrenovac
Project: Canopy Structure at Obrenovac Wholesale Market
Scope of Work: Fabrication and installation of the steel canopy structure and other secondary steel elements. The works also included roofing and flashing works, covering approximately 1,500 m² with 15 cm thick thermal insulation panels, including all required accompanying flashings and finishing elements.
Quantity: approx. 1,500 m²
Client: JADRAN d.o.o.
Location: Belgrade, Serbia
Year: 2023

11
BIG CEE Kragujevac
Project: BIG CEE Kragujevac Retail Center
Scope of Work: Fabrication and installation of various steel structures for the BIG CEE Kragujevac retail center. The scope included steel pergolas, canopies, bay window structures, parapet and attic steel elements, as well as the fabrication and installation of a 25 m high advertising totem.
Quantity: approx. 140 t of steel
Client: GIA d.o.o.
Location: Kragujevac, Serbia
Year: 2023

12
MK Kliniken Pancevo
Project: Modular Container Production Complex
Scope of Work: Fabrication and installation of steel structures, the scope included facade substructure, canopy structures, roof structure, bracing systems, other related steel elements and cladding of the facility.
Quantity: approx. 340 t of steel / approx. 40,000 m² of thermal insulation panel
Client: STRABAG d.o.o.
Location: Pančevo, Serbia
Year: 2023

13
Ravno Selo Cultural Center
Project: Steel works on reconstruction of the Ravno Selo Cultural Center
Scope of Work: Fabrication and installation of internal technical galleries and steel bridges within the cultural center building.
Quantity: approx. 25 t of steel
Client: MODULOR d.o.o.
Location: Vrbas, Serbia
Year: 2023

14
Aviation Academy
Project: Aviation Academy – “Petar Drapšin” Secondary School
Scope of Work: Fabrication and installation of steel structures for the reconstruction and extension of the Aviation Academy – “Petar Drapšin” Secondary School facility.
Quantity: approx. 145 t of steel
Location: Dorćol, Belgrade, Serbia
Client: JADRAN d.o.o.
Year: 2022

15
BioSense Institute
Project: Institute for Artificial Intelligence Research and University Center
Scope of Work: Execution, fabrication and installation of a complex cantilevered steel amphitheatre structure spanning three levels. The structure was made of custom-fabricated steel girders and included a 21 m cantilever overhang, requiring high-precision fabrication and installation of the main load-bearing steel elements.
Client: MODULOR d.o.o.
Quantity: approx. 155 t of steel
Location: Novi Sad, Serbia
Year: 2022

16
BIG Novi Sad
Project: BIG “Old Mill Center” Shopping Center
Scope of Work: Fabrication and installation of steel structures for the BIG “Old Mill Center” shopping center. The scope included the entrance portal, internal portal, intermediate floor structure, elevator shaft structure, advertising panels and other related steel elements, together with accompanying civil works and finishing trade works.
Client: BIG CEE SERBIA d.o.o.
Quantity: approx. 120 t of steel
Location: Novi Sad, Serbia
Year: 2022

17
Master Team
Project: Production, Warehouse and Administration Complex
Scope of Work: Fabrication and installation of the steel structure for a production, warehouse and administration complex. The scope also included accompanying roofing and cladding works, sheet metal works and waterproofing works required for the complete execution of the facility envelope.
Client: MASTER SOLAR d.o.o.
Quantity: approx. 95 t of steel
Location: Belgrade, Serbia
Year: 2022

18
Belgrade Drama Theatre
Project: Belgrade Drama Theatre – Summer Stage
Scope of Work: Main design, fabrication and installation of a modular demountable outdoor stage steel structure for the summer stage of the Belgrade Drama Theatre. The structure was designed and executed as a temporary assembly system suitable for outdoor use, repeated installation and dismantling.
Client: MILLENNIUM TEAM d.o.o.
Quantity: approx. 12 t of steel
Location: Belgrade, Serbia
Year: 2021

19
Glass Onion House
Project: Glass Onion House Film Set Structure
Scope of Work: Structural design of the load-bearing steel platform, together with the steel substructure required to support the spherical glass cladding system. The structure was designed and executed for the production needs of the feature film Glass Onion: A Knives Out Mystery, with interior set works carried out in Belgrade studios.
Client: WIP TKO PRODUCTIONS d.o.o.
Quantity: 55m²
Location: Belgrade, Serbia
Year: 2021

20
MFD Košutnjak
Project: MFD Košutnjak – Multifunctional Sports Hall
Scope of Work: Fabrication and installation of various steel structures for the multifunctional sports hall within the MFD Košutnjak sports complex. The scope included façade substructure, steel works for the shooting range, rooftop ventilation units, partition wall structures, platforms, opening reinforcements, shafts, access hatches and other related secondary steel elements.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 85 t of steel
Location: Belgrade, Serbia
Year: 2021

21
West 65
Project: West 65 Shopping Center and Tower
Scope of Work: Fabrication and installation of various steel structures for the West 65 Shopping Center and Tower complex in New Belgrade. The scope included shopping center roof lanterns, facade substructures, crane connection structures to the tower building, media wall steel structure, intermediate floor structures, entrance canopies, supports for mechanical installations, as well as underground metalwork including fences, access ladders, platforms, manholes, ramps, partitions and other related steel elements.
Client: PFB d.o.o.
Quantity: approx. 330 t of steel
Location: New Belgrade, Serbia
Year: 2020/2021

22
JAT TEHNIKA
Project: Nikola Tesla Airport – JAT Tehnika Hangar 2, Large Hangar
Scope of Work: Fabrication and installation of steel structures for the reconstruction of the roof lantern system on the existing Hangar 2 building at Nikola Tesla Airport. The works included replacement of light domes, execution of new steel support and secondary structures, and all accompanying roofing, sheet metal and waterproofing works necessary for the completion of the roof reconstruction.
Client: JAT Tehnika
Quantity: approx. 90 t of steel
Location: Belgrade, Serbia
Year: 2017/2020

23
Diplomatic Facilities
Project: Diplomatic and Administrative Facilities
Scope of Work: Execution of steel and locksmith works on various diplomatic and administrative facilities in Belgrade, including embassies, diplomatic missions, ambassadors’ residences, diplomatic schools, administrative buildings and management facilities. The scope also included accompanying construction works, roofing works, sheet metal works and craft finishing works required for the maintenance, reconstruction and adaptation of the facilities.
Client: DIPOS a.d.
Location: Belgrade, Serbia
Year: 2012/2021

24
Hotel Indigo
Project: Indigo Hotel, Belgrade City Center
Scope of Work: Fabrication and installation of steel structures for the Indigo Hotel building in central Belgrade. The scope included reinforcement of the existing building structure, execution of all newly designed steel structural elements, and small accompanying metalwork required for the reconstruction and adaptation of the facility.
Client: MILLENNIUM TEAM d.o.o.
Quantity: approx. 120 t of steel
Location: Belgrade, Serbia
Year: 2019/2020

25
Tamnava Mine Coal Dump
Project: Kolubara Tamnava Mine – New Coal Dump
Scope of Work: Fabrication and installation of steel structures for the new coal dump facility at the Kolubara Tamnava mine. The scope included belt conveyor bridges, service platforms, access ladders, staircases, safety fences and other related steel elements required for operation and maintenance access.
Client: ENERGOPROJEKT OPREMA a.d.
Quantity: approx. 90 t of steel
Location: Lazarevac, Serbia
Year: 2019

26
Bosch Complex Expansion
Project: Robert Bosch Production Complex Expansion Simanovci
Scope of Work: Fabrication and installation of steel structures for the expansion of the Robert Bosch production complex in Simanovci. The scope included steel structures for facilities PCI 102, PCI 105 and PCI 108, tubular bridge structures with spans of L=40 m and L=21 m, as well as accompanying metalwork including fences, access ladders, staircases, platforms, manholes, ramps, partitions and other related steel elements.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 350 t of steel
Location: Simanovci, Serbia
Year: 2018/2019

27
Kalenic Market Design
Project: Kalenic Market – Office 59 Reconstruction Design
Scope of Work: Reconstruction design for Office 59 within Kalenic Market in Vracar, Belgrade. The scope included preparation of design documentation for the adaptation and improvement of the existing market office space, with the aim of supporting its functional reorganization and integration within the existing market facility.
Client: JKP Belgrade Market
Quantity: approx. 317 t
Location: Vracar, Belgrade, Serbia
Year: 2019

28
Bridge over Lepenica
Project: Bridge over the Lepenica River in Batocina
Scope of Work: Fabrication and installation of the steel structure for a bridge over the Lepenica River in Batocina. The project included an arched steel bridge structure with a span of L=45 m, together with related structural steel elements required for the execution of the bridge. The bridge design features an exposed arch structure, simple semi-transparent railing and integrated lighting.
Client: BAUWESEN d.o.o.
Quantity: approx. 40 t of steel
Location: Batocina, Serbia
Year: 2019

29
Recycling Center Pozarevac
Project: Pozarevac Recycling and Waste Selection Center
Scope of Work: Fabrication and installation of the steel structure for the Recycling and Waste Selection Center in Pozarevac. The facility forms part of the municipal waste management infrastructure near the Jeremijino Polje landfill and is intended for sorting, baling and further transport of municipal waste. The scope included structural steel works for the recycling center buildings and related steel elements required for the operation of the waste selection complex.
Client: BAUWESEN d.o.o.
Quantity: approx. 80 t of steel
Location: Pozarevac, Serbia
Year: 2019

30
Railway Infrastructure Works
Project: Belgrade Railway Infrastructure Works - Resnik, Kijevo, Rakovica, Knezevac
Scope of Work: Fabrication and installation of steel structures and metalwork for railway infrastructure facilities in Belgrade. The scope included steel works at Resnik railway station, including an emergency intervention facility and wagon repair hall, as well as platform railings, staircases and ramps at Resnik, Kijevo, Knezevac and Rakovica railway stations. The works also included steel bearing chairs at Belgrade Center railway station, Prokop, used for receiving and supporting concrete structural elements.
Client: BAUWESEN d.o.o.
Quantity: approx. 250 t of steel / approx. 300 m of steel and stainless steel railings
Location: Belgrade, Serbia
Year: 2018

31
autobuska stanica nbbggd.jpg
Project: New Belgrade Bus Station – Annex Building
Scope of Work: Fabrication and installation of the steel structure for the annex building of the new bus station complex in Block 42, New Belgrade. The scope included the main structural steel elements and related secondary steel components required for the execution of the annex facility.
Client: BAUWESEN d.o.o.
Quantity: approx. 50 t of steel
Location: New Belgrade, Serbia
Year: 2018

32
CRH Cement Plant
Project: CRH Cement Plant – New Furnace Building
Scope of Work: Main structural design of the steel structure for the new furnace building within the CRH cement plant in Popovac. The scope included design documentation for the main load-bearing steel structure and related steel elements required for the execution of the industrial facility.
Client: CRH d.o.o. / Holcim Srbija / GOSA MONTAZA a.d.
Quantity: approx. 104 t of steel
Location: Popovac, Paracin, Serbia
Year: 2018

33
Daily Express
Project: Daily Express Distribution Center – Reconstruction and Extension
Scope of Work: Fabrication and installation of the steel structure for the reconstruction and extension of the Daily Express distribution center on Pancevacki Put in Belgrade, within the former “Janko Lisjak” factory complex. The project covered an extended facility area of approximately 10,000 m² and included a large-span steel structure with a maximum span of L=54 m. The scope also included accompanying construction works, roofing and cladding works, as well as sheet metal works required for the complete execution of the facility envelope.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 220 t of steel / approx. 10,000 m² facility extension
Location: Belgrade, Serbia
Year: 2017

34
Nikola Tesla Airport
Project: Nikola Tesla Airport – Terminal 1 and Terminal 2 Reconstruction
Scope of Work: Fabrication and installation of steel structures for the reconstruction and adaptation of Terminal 1 and Terminal 2 at Nikola Tesla Airport in Belgrade. The scope included structural steel works and related secondary steel elements required for the execution of the terminal adaptation works within the existing airport facilities.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 70 t of steel
Location: Belgrade, Serbia
Year: 2016/2017

35
Bezanijska Kosa Market
Project: Bezanijska Kosa Market
Scope of Work: Fabrication and installation of steel structures for the Bezanijska Kosa Market facility in Belgrade. The scope included the main and secondary steel structures, together with accompanying construction works, roofing and cladding works, as well as sheet metal works required for the complete execution of the market facility.
Client: VEGRAP d.o.o.
Quantity: approx. 100 t of steel
Location: Bezanijska Kosa, Belgrade, Serbia
Year: 2017

36
Napred Business Building
Project: Napred Business Building – Extension and Reconstruction
Scope of Work: Fabrication and installation of steel structures for the extension and reconstruction of the Napred Business Building in New Belgrade. The scope included reinforcement of the existing concrete structure, execution of the new load-bearing steel structure for the building extension, intermediate floor structures and other related steel elements required for the reconstruction works.
Client: NAPRED a.d.
Quantity: approx. 150 t of steel
Location: New Belgrade, Serbia
Year: 2016

37
Obilicev Venac Public Garage
Project: Obilicev Venac Public Garage – Reconstruction and Extension
Scope of Work: Fabrication and installation of special steel elements for the reconstruction and extension of the Obilicev Venac public garage in central Belgrade. The scope included custom steel positions and related structural elements required for the adaptation and upgrade of the existing garage facility.
Client: MILLENNIUM TEAM d.o.o.
Quantity: approx. 45 t of steel
Location: Belgrade, Serbia
Year: 2016

38
Bolec Shopping Center
Projects: Bolec Shopping Center; JP Ada Ciganlija Administrative Building; Unicredit Bank Administrative Building; W.D. Concord West Administrative Building; Magna Pharmacia Fitness Club; Beorol Production Plant; Hit Auto Sales Salon; Energotehna Juzna Backa Canopies; Lilly Drogerie Business Buildings; Take Square Rodizzio GTC Restaurant.
Scope of Work: Fabrication and installation of steel structures for multiple extensions, reconstructions and adaptations of commercial, administrative, industrial, retail and hospitality facilities.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 950 t of steel
Location: Belgrade, Serbia
Year: 2015/2016

39
Häfele Showroom
Project: Häfele Showroom, New Belgrade Block 41
Scope of Work: Concept design, interior design, design for execution and execution of fit-out works for the Häfele showroom in New Belgrade. The scope included preparation of design documentation and complete interior fit-out works required for the showroom space.
Client: HAFELE SERBIA d.o.o.
Quantity: Project Documentation
Location: New Belgrade, Serbia
Year: 2015

40
DIS Market
Project: DIS Novi Sad; DIS Lazarevac; DIS Kaludjerica; DIS Krnjevo; DIS Novi Banovci; DIS Indjija; DIS Mladenovac; DIS Velika Plana; MAXI-145; MAXI-782; MAXI-143; MAXI-761; MAXI-496; MAXI-129; MAXI-502; MAXI-124; MAXI-185; MAXI-195; TEMPO Kvantas; MAXI-104; MAXI-141; MAXI-182; MAXI-485; MAXI-764; TEMPO Ada Ciganlija; Delhaize Distribution Center
Scope of Work: Fabrication and installation of steel structures, locksmith works, sheet metal works and finishing trade works.
Client: W.D. CONCORD WEST d.o.o.
Quantity: approx. 1,670 t of steel
Location: Serbia
Year: 2015/2016

41
Lukoil Gas Stations Totem
Project: Lukoil Gas Stations; Air Serbia Administration Building, Belville;
Scope of Work: Fabrication and installation of steel structures for advertising boards, billboards and advertising totems. The scope included 4 advertising billboards for the Air Serbia Administration Building in Belville and 33 advertising totems for Lukoil gas stations.
Client: ELITAS d.o.o.
Quantity: approx. 220 t of steel / 4 billboards / 33 advertising totems
Location: Serbia
Year: 2014/2015

42
Rectorate of the University of Belgrade
Project: Rectorate of the University of Belgrade – Kapetan Misino Zdanje
Scope of Work: Fabrication and installation of steel structures for the extension, reconstruction and adaptation of the Rectorate of the University of Belgrade, Kapetan Misino Zdanje. The scope also included accompanying construction works, sheet metal works and finishing trade works required for the adaptation of the existing historic building.
Client: ORNAMENT d.o.o.
Quantity: approx. 50 t of steel
Location: Belgrade, Serbia
Year: 2013/2014

43
Sojaprotein Industrial Complex
Project: Sojaprotein Industrial Complex – Silos
Scope of Work: Fabrication and installation of steel structures for the extension, rehabilitation and reconstruction of the Sojaprotein industrial silo complex in Becej. The scope included steel works on the reception bunker, elevator columns, unloading terminals, openings on silo cells and other related structural steel elements.
Client: SOJAPROTEIN a.d. / VICTORIA GROUP a.d.
Quantity: approx. 120 t of steel
Location: Becej, Serbia
Year: 2013

44
Alubond Europe Production Factory
Project: Alubond Europe Production Factory; Ferro Corp Production Hall for Ship Elements; Messer Tehnogas Helium Distribution Center;
Scope of Work: Fabrication and installation of steel structures for production and industrial facilities. The works included extension and reconstruction of the Ferro Corp production hall for ship elements in Borca, steel structure works for the Messer Tehnogas helium distribution center in the Pancevo industrial zone, and steel structure works for the Alubond Europe production factory in Banatski Karlovac.
Client: FERRO CORP d.o.o. / MESSER TEHNOGAS a.d. / ALUBOND EUROPE d.o.o.
Quantity: approx. 350 t of steel
Location: Banatski Karlovac, Serbia / Borca, Belgrade, Serbia / Pancevo, Serbia
Year: 2012/2013
Slanački put 26,
Belgrade, Serbia
11120
Visit us
Location
Company Details
TIN - 100208383
CRN - 06050093
You imagine, we deliver it...
office@foring.co.rs
+381 63 497 492
Monday - Friday
8:30 am – 4:30 pm
bottom of page